New
CEKOL TERMO W1 is applied to sticking the thermal external insulation of mineral wools slabs to mineral surface, inside and outside of the buildings.
WATER AND FROST RESISTANT
NON-ABSORBENT
PLASTIC
SUITABLE FOR MANUAL OR MECHANICAL APPLICATION
COVERAGE 5.5 SQM PER BAG
PRICE PER 25KG BAG
Availability date:
INSTRUCTIONS FOR USE
THE SURFACE PREPARATION
The surface should be clean, closed and free from grease. Paint, loose grains of sand and plaster and any layer temporally connected to the ground should be removed.
PRIMING
High-absorbed surfaces and exposed to moisture should be grounded with the priming emulsion CEKOL DL-80.
MORTAR PREPARATION
Pour the package contents to cold water in a ratio of 5 to 5.5 litres of water per 25 kg bag and mix thoroughly, preferably with a mechanical stirrer. Then wait for approximately 3 minutes and again mix well. The time of mortar application approx. 3 hours.
APPLICATION
In order to stick the thermal insulation of mineral wool, apply the adhesive in points using no less than 12 points on 1m², the volume of not less than 120cm³ each. Additionally, on the mineral wools boards, apply mortar on the edges to form a frame around the board of a width of 3 cm and a thickness of approx. 1 cm. Stick the insulating boards up to 20 minutes after the mortar has been applied on the wool. The insulating boards arrangement can be adjusted up to 10 minutes since they have been sticked.
PERFORMANCE
Wool sticking – approx. 4 kg/m2. The temperature of the performed works: from +5ºC to +25ºC.